The images above are of the Gwinnett Online Campus auditorium. The auditorium was formerly a cafeteria when this building was an elementary school prior to becoming GOC, so have historically been acoustic and spacing challenges. I worked with Nisewonger A/V to redesign the auditorium in the Fall of 2023 to upgrade nearly all aspects of the auditorium, including two new laser projectors (total of 4), VIA Go wireless casting system, 4 room-facing speakers, 2 stage monitors, new ceiling speakers, a subwoofer ceiling panel, 4 PTZ cameras, Midas soundboard, Vaddio A/V matrix, Audix lapel and handheld microphones, amplifiers, and two iMac computers.
The room is most frequently used for staff meetings, "GOC Friday" events, hosting outside groups, and student performances.
The video above is of the 2024 GOC Spring Musical and shows the new system in action.